portfolio_page-template-default,single,single-portfolio_page,postid-97,bridge-core-3.0.8,qi-blocks-1.2.7,qodef-gutenberg--no-touch,qodef-qi--no-touch,qi-addons-for-elementor-1.6.9,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-29.5,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-6.10.0,vc_responsive,elementor-default,elementor-kit-5
 

Swift Creek Bridge Replacement

Swift Creek

Facilitated by Caltrans District 2, this project includes
removing and replacing the Swift Creek Bridge and
realigning Highway 3 to accompany the new bridge
roadway. Construction activities for the new road will
include clearing vegetation within the new road
alignment, then construction of the new road, four new
culverts beneath the road, and construction of the
bridge. After removal of the existing bridge, pier,
roadway, and culverts beneath the roadway, the
streambed will be recontoured, and trapezoidal ditches
will be installed in place of two former culverts.
The Swift Creek Bridge will be on the new alignment and
will be a two span bridge of approximately 198 ft. long
with a deck 44 ft. wide, consisting of two 12 ft. wide lanes
and two 8 ft. wide shoulders. It will be constructed
approximately 80-ft. downstream of the existing bridge.